Customer Responsibilities
The customer must:
• | Provide to the NCR Customer Service Representative, upon request, drawings that adequately indicate: |
• | Location of the NCR equipment. |
• | Power and signal site wiring (including paths and lengths). |
• | Location of other equipment capable of generating electrical noise, electromagnetic interference, heat, and so forth. |
• | Make the building alterations that are necessary to meet wiring and other site requirements. |
• | Provide and install all communications cables, wall jacks, special connectors, and associated hardware. |
• | Provide and install the necessary power distribution boxes, conduits, grounds, lightning protection, and associated hardware. |
• | Make sure all applicable codes, regulations, and laws (including, but not limited to, electrical, building, safety, and health) are met. |
• | Provide and install auxiliary power or other equipment, as required. |
• | Provide storage or service areas, as required. |
• | Make sure the environmental requirements of the system/unit are met. |
• | Provide floor coverings and environment systems that limit or control the buildup or discharge of static electricity. |